O3 Mining Intersects 2.9 g/t Au Over 14.2 Metres Near Surface at Marban
November 3, 2020
O3 Mining CEO, Jose Vizquerra joined Steve Darling from Proactive to discuss new drilling results on the Malartic Property, including 2.9 g/t au over 14.2 metres near surface and 145 metres outside of pit shell at Marban Project
The following video may include forward-looking statements, O3 Mining Inc. directs viewers to the cautionary notes on page two of O3 Mining’s Corporate Presentation, located at https://o3mining.com/
Back