O3 Mining Intersects 383.4 g/t Au Over 2.0 Metres Including 1,510 g/t Au over 0.5 Metres at Marban Project

November 24, 2020

O3 Mining CEO Jose Vizquerra joined Steve Darling of Proactive to discuss new drilling results at its Malartic property, including 383.4g/t Au over 2.0 metres in hole O3MA-20-008, 1,510g/t Au over 0.5 metre, 1.8g/t Au over 5.0 metres in hole O3MA-20-002 and 16.8g/t Au over 0.5 metres in hole O3MA-20-003.

The following video may include forward-looking statements, O3 Mining Inc. directs viewers to the cautionary notes on page two of O3 Mining’s Corporate Presentation, located at https://o3mining.com/

Back